Project Showcase

Fong Yi Industries (Case Study)

Our company was founded in year 2003 at Ayer Tawar town in Perak state. In small production level, plasterboards were manufactured and supplied for local market only.

 

In the following years, rise of market demand enhanced our development. Our first factory was then expanded to size 105,000ft2. Collectively in year 2005, second factory sized 216,000ft2 was set up. Manufacturing of plasterboards and other related plaster products such as L-boxes, manholes, central panels, corbels, beading linings, beading heads, and roman pillar were introduced.

 

In year 2007, S11 and UEC branded plaster and/or cement based compound were launched and supplied to the marketplace. With strong foundation we built and network support in local and oversea, our company was expanded in a fast pace. In year 2009, third factory sized 217,000ft2 and forth factory sized triple of the forth were set up.

 

Currently, we are manufacturing and supplying mainly plaster & cement compound, plaster products, plasterboards, galvanized metal products and also some other building materials in local and oversea. We work at our best effort to achieve sustainable and quality growth of our company.

Case Study - Demo Design

Concept Design Preview

Thanks for Scrolling!

Copyright © 2016 Fleave Design. All Rights Reserved.